8 tons DZL Biomass Fired Steam Boiler Project

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :8 tons DZL Biomass Fired Steam Boiler Project
  • Supply Capacity : 10 units/month :8 tons DZL Biomass Fired Steam Boiler Project
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Waste Heat Recovery System - an overview | ScienceDirect

    2.10. Selection of waste heat boiler. The quantum of waste heat available and the temperature at which it is available more or less decide the systems to be used for cogeneration. Apart from the system choice, there are also several choices regarding how to fit the system. These aspects are dealt with in the following chapters.Get Price

  • Mundra Thermal Power Plant | Adani Power Limited

    2 super critical units (Unit-8 and Unit-9 of Mundra TPP) completed the steam blowing within 2 days from boiler light up. Mundra unit 3,5 & 9 i.e three units at single location achieved full load operation from synchronization in less than 4 days. NABL …Get Price

  • Thermax - Wikipedia

    Thermax Ltd is an Indian engineering company, involved in energy and environment, headquartered in Pune.Thermax's business portfolio includes products for heating, cooling, water and waste management, and specialty chemicals.The company also designs, builds and commissions large boilers for steam and power generation, turnkey power plants, industrial …Get Price

  • Masterbuilt 10 Liter XL Electric Fryer, Boiler, Steamer in

    Make sure your family is eating well this holiday season by using the Butterball XL 10 Liter Electric Countertop 3 in 1 Fryer, Boiler, and Steamer by Masterbuilt. The extra-large capacity allows you to cook enough food for the entire family or tailgate visitors. Fry up a turkey, steam up some veggies or boil all the potatoes.Get Price

  • Mundra Thermal Power Plant | Adani Power Limited

    2 super critical units (Unit-8 and Unit-9 of Mundra TPP) completed the steam blowing within 2 days from boiler light up. Mundra unit 3,5 & 9 i.e three units at single location achieved full load operation from synchronization in less than 4 days. NABL …Get Price

  • BOE (BOILER OPERATION ENGINEERING) QUESTIONS AND ANSWERS

    Jul 23, 2017 · BOE (BOILER OPERATION ENGINEERING) QUESTIONS AND ANSWERS FOR ALL STATS BOARD:-In this post you we discussed about the BOE (BOILER OPERATION ENGINEERING ) short type question answer these question selected by the experienced BOE (BOILER OPERATION ENGINEERING ) which worked in different stats of India and also outside of the …Get Price

  • DSR 2021 Vol I English Dir | PDF | Construction Aggregate

    0001 Hire charges of Coaltar Boiler 900 to 1400 litres day 800.00 0002 Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper day 800.00 0003 Hire charges of Diesel Road Roller - 8 to 10 tonne day 3000.00 0004 Production cost of concrete by batch mix plant cum 400.00 0005 Hire charges of Diesel Truck - 9 tonne (with POL) day 3940.00 0006 Get Price

Discount
7X24 Online