8t h coal fired chain grate steam boiler ship to columbia
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
11. Steam enters the turbine of a cogeneration plant at 7.0 MPa and 500 ºC. Steam at a flow rate of 7.6 kg/s is extracted from the turbine at 600 kPa pressure for process heating. The remaining steam continues to expand to 10 kPa. The recovered condensates are pumped back to the boiler.Get Price
At this output, the thermal A boiler feed pump receives 40 L/s at 4 MPa and 180C. Supplementary Problem A closed tank contains liquefied butane gas whose specific gravity is 0.60. The tank pressure us 1.7 Mpa gage which is also the equilibrium vapor pressure of butane at the pumping temperature.Get Price